Sewage Discharge Permission and Public Information

Pollutant Discharge Permit

国家排污许可证.jpg



Basic Information
Company Name

RayBen Technology

(Zhuhai) Co., Ltd.

Organization Code727069893
AddressXipu Road, Xinqing Science and Technology Industrial Park, Doumen District, Zhuhai NO.8Geographic locationlongitude:113°16′19″,latitude:22°09′01″
Legal representative林伟乐Postal code519180
Environmental Leader冼卫安E-mailan@rayben.com
Industry CategoryPrinted circuit board manufacturingTelephone+86-756-6320666
Production cyclePerennialPollution source level managementCounty direct management
Company ProfileRayben Technology (Zhuhai) Co., Ltd. was established in 2001, which it is located in Doumen District of Zhuhai City Xinqing Science and Technology Industrial Park. Registered capital is HK $ 161.6 million, covering an area of   approximately 33,112.07 square meters and the existing number of employees is 1,000 people. The company mainly produces PCB, LED and other electronic products.



Wastewater Discharge Information
Sewage outlet nameWastewater treatment facility discharge outlet

Pretreatment discharge outlet

for nickel-containing wastewater

Pretreatment discharge outlet

for chromium-containing wastewater

Sewage outlet numberWS-41010WS-41010-1WS-41010-2

Discharge destination

(name of receiving waterway)

JiTiMen waterway

(NiWanMen waterway) HD06000

Integrated wastewater collection poolIntegrated wastewater collection pool

Wastewater discharge

implementation standards

Implementation the "Plating

Water Pollutant Emission Standards

(DB44/1597-2015).If there is new

standards, according to the new standards.

Implementation the "Plating Water

Pollutant Emission Standards"

(DB44/1597-2015). If there is new

standards, according to the new

Implementation of the "Electrical

Water Pollutant Emission Standards"

(DB44/1597-2015), if new standards

are met, according to the new standards.

Major contaminant nameCOD

Ammonia

nitrogen

Total

copper

Suspended

matter

Total nickelTotal chromium

Hexavalent

chromium

Emission concentration

limit (mg/L)

80150.5300.50.50.1

Total control indicator

(ton/year)

99.9912.36




Annual wastewater discharge limit

(10,000 tons / year)

165



Exhaust Discharge Information
Sewage outlet nameProcess exhaust ventProcess exhaust ventProcess exhaust vent
Sewage outlet numberFQ-41010(A-B、D-E、L-M)FQ-41010(N)FQ-41010(F-J、O-Q)
Exhaust Discharge Implemention StandardsImplement the national "Emission Standard of Pollutants for Electroplating" (GB21900-2008), if there are new standards, executed according to the new standard.Air Pollutant Releasing Limits (DB44/27-2001).The second period of the first-level standard is stricter and the second-level standard.Air Pollutant Releasing Limits (DB44/27-2001).The second period of the first-level standard is stricter and the second-level standard.If there is a new standard, implement according to the new standard.
Major contaminant nameHydrogen chlorideSulfuric acid mistBenzeneTolueneXyleneParticulate Matter
Emission concentration limit3030124070120
Sewage outlet numberFQ-41010(C、K)FQ-41010(R)
Exhaust emission emission standardsThe emission standards for odor pollutants (gas) (GB-14554-93), if there is a new standard, implement according to the new standard."Atmospheric pollutant discharge limit" (DB44/27-2001) In the second period follows the second standard. If there is a new standard, implement according to the new standard.
Major contaminant nameAmmoniaTin and compound
Emission concentration limit (mg/m3)
8.5

Annual exhaust emission limit (10,000 standard cubic

meters / year)

336607.92



Environmental Monitoring Information
Monitoring methodEntrust Monitoring, Automatic Monitoring and Manual MonitoringName of Entrust  Monitoring AgencyZJYTEST
Monitoring LocationLongitude: 113°16′19′′, latitude: 22°09′01′′Self-monitoring program
Monitoring annual reportNot self-monitoring reasons/
Data of automatic monitoring resultContinuous monitoring every dayData of automatic monitoring resultDoumen District Environmental Protection Monitoring Station, Zhuhai City



Water Pollution Control Facility Construction and Operation Information

Governance

facility name

Date of operationTreatment process

Design

processing capability

Actual throughputoperation hoursOperating status
Sewage treatment stationSince 2008Physicochemical and biochemical treatment processes5000M3/d2000M3/d24 hours continuous processinggood



EIA and Other Administrative Licensing Information
Name of project fileProject file nameProduction or approval unitDocument numberDescription
EIA Report"Evaluation report on environmental impact of Rayben annual output of 100㎡ of PCBs construction project "Doumen District Environmental Protection Bureau, Zhuhai CityDouhuan Jianshu [2010] No. 004, Douhuan [2010] No. 23If you need this report, please contact us then we will send it to you.
EIA Report"Evaluation report on environmental impact of Rayben annual output of 50㎡ of PCBs construction project"Doumen District Environmental Protection Bureau, Zhuhai CityZhuxin Huanguanzi [2004] No. 49If you need this report, please contact us then we will send it to you.
EIA Approval"Evaluation report on environmental impact of (ZhunDa) annual output of 50㎡ of PCBs construction project"Doumen District Environmental Protection Bureau, ZhuhaiZhuxin Huanguanzi [2004] No. 50If you need this report, please contact us then we will send it to you.



Environmental Emergency Response Information
Contingency plan for Environmental EmergencyYes
Environmental risk assessment reportYes
Environmental risk prevention workOur company regularly conducts emergency drills for environmental emergencies, which can correctly respond to local or regional environmental pollution incidents caused by sudden environmental pollution incidents and ecological damage. It can ensure that on-site emergency handling, disposal, and after-care work can be carried out quickly and effectively during an accident to maximize the protection of people's lives and property.
Sudden environmental incidents and disposalNo sudden environmental events
Implementation of rectification requirementsNo





乐健科技自行监测方案.png

乐健科技自行监测方案    




contact us